Changqing Oilfield Pioneers a New Path for Shale Oil Production Growth

2025-11-21

On November 12th, it was learned that a well at the shale oil fracturing site in the main oilfield area of Longdong in Changqing Oilfield successfully completed the carbon dioxide energy-enhanced fracturing operation and simultaneously achieved multiple integrated tests

View details

Liaoyang Petrochemical: Adapting to the Seasons to Ensure the Production of Low Pour Point Diesel

2025-11-14

​As temperatures in Northeast China continue to drop, the pressure to ensure a steady supply of low pour point diesel has been increasing.

View details

The automatic pipe pusher device of the Downhole Operations Company of Dagang Oilfield reduces burden and empowers.

2025-11-07

On November 3rd, at the well maintenance site of Well West 17-9 in the Downhole Operations Company of Dagang Oilfield, employees completed the operation tasks that previously required the

View details

The Liaohe Oilfield has put a new device into use, reducing the comprehensive cost per ton of liquid by more than 20%.

2025-10-31

On October 28th, it was learned from Liaohe Oilfield that after the Shu 5 Combined Station of the oilfield adopted the new-generation low-temperature electric dehydration device,

View details

Jidong Oilfield Develops a New Type of Filter Core Carbonization Cleaning Device to Reduce Costs and Increase Efficiency

2025-10-24

On October 22nd, at the Laoyema Joint Station of the Oil and Gas Gathering and Transportation Company of Jidong Oilfield, employees used a newly developed carbonization cleaning device for filter cores to clean the filter cores.

View details

Daqing Oilfield develops wide-area tracer logging technology

2025-10-11

View details

The digital transformation of BaiKouQuan Oil Production Plant in Xinjiang Oilfield has achieved quality and efficiency improvement.

2025-09-26

As of now, the Internet of Things (IoT) online rate of the BaiKouQuan Oil Production Plant in Xinjiang Oilfield has remained stable at 98%, with data accuracy reaching 99% and equipment integrity rate maintained at 95%.

View details

The Dagang Oilfield has adopted differentiated water injection to tap the potential of remaining oil.

2025-09-19

View details

The Fourth Drilling Company of Bohai Drilling has set multiple new records in Jidong Oilfield.

2025-09-05

View details

Jilin Oilfield's Closed Core Sampling Guides the Potential Exploration in the Old Area

2025-08-29

View details